Home/Answers/Main line
SEWER COST LAB / Main line

How to Set Up Main line

To set up Main line, confirm the input format/device, choose output settings, then run a small batch.

Updated 2026-11-01About 3 minLocal test
Quick answer

To set up Main line, confirm the input format/device, choose output settings, then run a small batch. Main line/connection/city-side responsibility must be confirmed.

Why it matters

Validate on a small sample before running the whole batch.

Connection.

Step by step

  1. Camera/locate and identify roots/collapse/grease.
  2. Compare rooting/spot repair/lining/excavation.
  3. Get 2-3 quotes; confirm scope/excavation/restoration.
  4. Contract states permits/restoration/warranty.

Common mistakes

  • Excavating without inspection.
  • Price only, not scope/restoration.
  • Ignoring roots/collapse/grease/slope.
  • Not checking permits/warranty.

Checklist

  • Inspection/location/problem.
  • Rooting/spot/lining/replacement.
  • Excavation/restoration/permits.
  • Warranty/insurance/payment.
  • Prevention/budget.

Key facts

  • Connection.
  • City.
  • Responsibility.

FAQ

How do I set up Main line?

To set up Main line, confirm the input format/device, choose output settings, then run a small batch. Main line/connection/city-side responsibility must be confirmed.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: Angi